I recently converted to MDT 2012 after running MDT 2010 for awhile (which has been great). Johan had written up an article (http://www.deployvista.com/Home/tabid/36/EntryID/139/language/en-US/Default.aspx) that allows you to do settings per task sequence without the use of a database which was amazing for our environment. After switching to 2012 this no longer works. Is there something I'm missing or what do I need to change to make this work?
Thanks!
Joe