Team,
Need Help...I am at my last google search for help...I was recently tasked to upgrade my MDT environment due to slowness. Now granted the current (old) environment has the following differences: Deployment Share is on a SAN, DHCP is installed on another server, MDT is installed with WDS installed and configured on another server. However, I had an entirely new network built with a lot of speed which was tested but deployment times of the same wim file and Task Sequence is 9 to 11 (takes 22 to 31) minutes slower and my for bosses this is unacceptable. My new server runs all the same of: (new Windows 2016 Dell R640), has DHCP installed and configured, runs WDS with all the current updated settings and has MDT 8456 installed. I have removed Symantec EndPoint have added a PowerCFg command to the Task Sequence. The Install Operating System part of the Task Sequence is like watching paint try compared to my the old MDT server and environment (16 to 19 minutes.) The reason for the new network is because when 2 to 5 systems gets image the network cannot handle it compare to what was built in the new network...Help!!